C. Vent Terminal Clearances
C
V
B
J
B
V
D
V
U.S.A. Installations: In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code.
Canadian Installations: In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code.
A
clearance above grade,veranda, porch, deck, balcony or roof.
B
clearance to window or door that may be opened, or to permanently closed window
clearance below unventilated soffit
C
clearance below ventilated soffit
clearance below any vinyl soffits and electrical service
D
clearance to outside corner
E
clearance to inside corner
F
clearance to each side of center line extended above gas meter/regulator assembly
G
clearance to gas service regulator vent outlet
clearance to non-mechanical air supply inlet to building or the combustion air inlet to
H
any other appliance termination (mechanical or non-mechanical)
clearance to a mechanical (powered) air supply inlet
I
***(All mechanical air intakes within 10 feet of a horizontal termination cap must be
a minimum of 3 feet below termination.)
On public property: clearance above paved sidewalk or a paved driveway.
J
**(A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings
and serves both dwellings.)
clearance from sides of electrical service
K
Location of the vent termination must not interfere with access to the electrical service.
clearance above electrical service
L
Location of the vent termination must not interfere with access to the electrical service.
clearance under veranda, porch, deck, balcony or overhang
*(Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of
M
two sides beneath the floor.)
vinyl or composite overhang
Figure 4.5
Minimum Clearances for Termination
F
B
V
G
V
A
Heat & Glo • SL-5F-IFT, SL-7F-IFT Installation Manual • 2638-980 Rev. H • 6/22
= AREA WHERE TERMINAL IS NOT PERMITTED
X
= AIR SUPPLY INLET
V
= VENT TERMINAL
H or i
X
V
H
M
V
V
H
V
K
Electrical
V
Service
A
U.S.A.
12 in. (305 mm)
12 in. (305 mm)
9 in min.
(229 mm min.)
(305 mm min.)
18 in. (457 mm)
18 in. (457 mm)
18 in. (457 mm)
18 in. (457 mm)
30 in. (762 mm)
30 in. (762 mm)
6 in. (152 mm)
6 in. (152 mm)
6 in. (152 mm)
6 in. (152 mm)
3 ft (914 mm)
Clearance in accor-
within a height 15
dance with local in-
ft (4.5 m) above
stallation codes and
the requirements of
the meter/regula-
the gas supplier.
tor assembly
3 ft (914 mm)
3 ft (914 mm)
9 in min.
(229 mm min.)
(305 mm min.)
3 ft (914 mm)***
6 ft (1.8 m)
7 ft (2.1 m)
7 ft (2.1 m)**
6 in. (152 mm)
6 in. (152 mm)
12 in. (305 mm)
12 in. (305 mm)
18 in. (457 mm)
12 in. (305 mm)*
42 in. (1.1 m)
42 in. (1.1 m)
V
L
K
V
C
V
CANADA
12 in. min.
12 in. min.