At this point, the first cable tie is positioned in the rotary receiver slot. The dispenser will display "LOAD 14" in
the header of the main screen. While maintaining a slight inward pressure on the cable ties, press the "Load"
icon once to successfully load and align the first cable tie. The dispenser will load 1 cable tie and display "LOAD
13" in the header. Press and hold the load button to load the remaining cable ties. Once the unit is loaded it will
display "Ready". The dispenser door must be closed to load or cycle the system. The rotary receiver will not
advance if the door is open. Once the ties are loaded the system is ready for use.
NOTE: Should the ties need to be removed from the dispenser, this is done by pressing the "Unload" icon on
the display screen while applying slight force to pull the ties back out of the dispenser after depressing
3 times. The unload function reverses the rotary receiver's rotation which backs the cable ties out of
the dispenser. NEVER pry the rotary receiver, or turn it, or touch it with your hand. Only use the "Load"
or "Unload" icons to rotate the rotary receiver. The "Unload" icon is accessed by selecting the
maintenance icon on the operator menu and then the settings icon.
NOTE: Periodically clear out extra ties from under the dispenser to prevent jams.
7F: Reloading Procedure
1. The carrier strip scrap bin will hold one half reel of scrap (½ reel = full collection bin). To maintain an exit for
carrier strip scrap, the scrap bin should be emptied after 2500 cable ties have been installed. The carrier strip
scrap bin should be lifted off the dispenser, emptied and replaced.
2. Press the Maintenance and Settings icons to take you to the unload feature. Before loading a full reel, press
the "Unload" icon to verify that any remaining ties on the carrier strip are pulled out of the dispenser. Once the
dispenser stops its reverse motion to empty the remaining cable ties, gently pull the cable ties by the carrier
strip till the remaining carrier strip is fully removed from the dispenser. Remove all cut cable ties under the
dispenser before loading the new cable tie reel.
3. Once the full cable tie reel is positioned correctly, to reload, follow the Loading XMR Cable Ties section on
Page 17.
PA27647A01_05
OPERATION MANUAL
ENGLISH
Page: 19 of 64
PAT1M4.0, PAT1M4.0-BT
PAT1.5M4.0, PAT1.5M4.0-BT,