Table Of Contents - Henny Penny FlexFusion Installation Manual

Electric platinum combi team
Table of Contents

Advertisement

Directory of contents
1 Introduction .........................................................................  5
1.1 About this manual  ............................................................................  5
1.1.1 Explanation of signs  ..................................................................................   6
1.2 Staff qualification  .............................................................................  7
1.3 Use of the unit ...................................................................................  7
1.4 Warranty  ............................................................................................  7
2 Safety information  ..............................................................  8
3 Description of the unit  .....................................................  10
3.1 Overview of the unit  .......................................................................  10
3.2 Equipment and connection data  ...................................................  10
4 Transporting the unit  .......................................................  15
4.1 Transporting the unit to the installation site  ...............................  15
4.2 Unpacking the unit  .........................................................................  15
5 Setting up the unit  ............................................................  17
5.1 Minimum clearances  ......................................................................  17
5.2 Lifting the unit off the pallet  ..........................................................  18
5.3 Placing the unit on the equipment legs ........................................  19
5.4 Aligning the unit  .............................................................................  19
6 Connecting the unit ..........................................................  20
6.1 Opening and closing the housing .................................................  20
6.1.1 Removing and attaching side wall  ...........................................................   20
6.2 Making the power connection  .......................................................  21
6.2.1 Matching the unit to the connection voltage  ............................................   23
6.2.2 Connecting the power connection cable  .................................................   25
6.2.3 Connecting the power optimisation system  .............................................   26
6.2.4 Connecting to the potential equalisation circuit  .......................................   27
6.3 Connecting the kitchen management system  .............................  27
6.4 Making the basic control setting ...................................................  29
6.4.1 Changing the basic control setting  ..........................................................   29
6.5 Making the water connection  ........................................................  30
6.5.1 Connecting the tap water connection line  ...............................................   30
6.5.2 Connecting softened tap water to both connections  ...............................   31
6.6 Making the wastewater connection  ..............................................  32
6.7 Making the exhaust air connection  ..............................................  33
6.7.1 Connecting the exhaust air line  ...............................................................   34
7 Checking operation  ..........................................................  35
7.1 Checking the controls ....................................................................  35
Installation instructions
3

Advertisement

Table of Contents
loading

Table of Contents