Filter Installation - Trane Performance Climate Changer Installation, Operation And Maintenance Manual

Performance climate changer air handlers
Table of Contents

Advertisement

Component Installation Requirements

Filter Installation

Hazardous Voltage!
Disconnect all electric power, including remote disconnects before opening door. Follow proper
lockout/tagout procedures to ensure the equipment cannot be inadvertently energized. Failure to
disconnect power before servicing could result in death or serious injury.
Figure 40. Filter block-off placement
50
WARNING
To install filters:
1. Disconnect the power to the unit.
2. Open the filter section access door.
3. Slide the filters into the tracks.
Note: Bag filters must be installed with the pleats in the
vertical plane.
4. The block-off is permanently installed and will create a
seal when the access door is closed.
5. Close the access door slowly to allow any gasketing to
compress.
CLCH-SVX07C-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents