Lifting Inlet And Exhaust Hoods And External Pipe Cabinet (Chase) - Trane Performance Climate Changer Installation, Operation And Maintenance Manual

Performance climate changer air handlers
Table of Contents

Advertisement

Figure 7.
Lug holes
Diameter
Pipe cabinet
or hood lug

Lifting Inlet and Exhaust Hoods and External Pipe Cabinet (Chase)

Heavy Objects!
Always place, assemble, and suspend modules/subassemblies one at a time. Placing,
assembling, and/or suspending more than one module/subassembly at a time could result in
death, serious injury, or equipment damage.
See
Figure 8. Inlet and exhaust hood lifting
Recommended
attachment to
lift lugs
CLCH-SVX07C-EN
Width
Height
Unit lug
\For outdoor air handlers, never stack the pipe cabinet or inlet hood on the unit as it is being
lifted.
Do not attach the intake/exhaust hood or pipe cabinet to the unit prior to lifting the unit. Doing
so may damage the equipment. Attach the hoods to the unit only after all sections are in place.
For outdoor air handlers, all shipping supports and crating on the face of the sections must be
removed to permit proper fit-up and sealing of the surfaces. Dispose of properly.
WARNING
Figure 7
and
Table 8
for lug hole sizes.
Table 8.
Lug hole sizes
Section
Location
Unit Size
Indoor
Indoor
Unit Lug
Hole Size
Indoor
Outdoor
Pipe Cabinet
Outdoor
Hood
Outdoor
Figure 9. Pipe cabinet lifting
Rigging and spreader
bar provided by
contractor
Recommended
attachment to
lifting lugs
Installation - Mechanical
Width
3-30
0.88
35-57
1.38
66-120
1.25
3-30
1.25
3-120
2.5-in. diameter
3-120
1-in. diameter
Height
1.38
1.25
2.75
2.75
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents