Trane Performance Climate Changer Installation, Operation And Maintenance Manual page 51

Performance climate changer air handlers
Table of Contents

Advertisement

2. Apply gasketing to the mating surface of the primary unit at the bottom of the opening (see
Figure 36. Apply gasketing to the mating surface of the primary unit.
3. Lift the secondary unit, follow instructions in
4. Install trim angles as shown in
Figure 37. Install trim angles
Vertical and horizontal
CLCH-SVX07C-EN
Figure
36.
Figure
6), and place on the black unit support brackets (see
must be centered on the primary unit between the black unit support brackets.
a powered impact gun and taking care not to strip the screws.
trim angles
Gasket
1-inch T x
2 1/2 inch W
Airflow
"General Lifting Considerations" on page 25
Figure 37
inserting the 10-16 x 3/4-inch self-drilling screws using
Airflow
Installation - Mechanical
Figure 33, p.
45. The secondary unit
(see
47