Trane Performance Climate Changer Installation, Operation And Maintenance Manual page 38

Performance climate changer air handlers
Table of Contents

Advertisement

Installation - Mechanical
Figure 19. Horizontal section-to-section quick connects
5. Use a bar clamp to pull adjacent shipping section lifting lugs together.
Figure 20. Wedge block attachment
Screw
0.250-14 x 0.75
Leached self-driller
7. Verify that the subassembly with the overhang profile on the roof is higher than the mating
34
Use 2 x 4 inch wood to protect
hands from accidental pinching
Wedge block
subassembly. If it is not, raise one end of the subassembly and bring the unit together. See
Figure
21. In addition, an adjustment can also be made to the height of the roof of either
subassembly by loosening the screws in the vertical channels or component structure and
adjust the height of the roof (see
4. If the unit is equipped with factory-
mounted controls, move adjacent
subassembly within six inches and fasten
quick connects where the sections bolt
together (see
Note: Reference the appropriate controller
manual for more details on the
installation of units with factory-
mounted controls.
6. For indoor units sizes 66-120 and for outdoor units
size 10-120, a wedge block is provided to aid in
pulling and aligning the units together. Attach the
wedge blocks to both sides of the units being
pulled together, matching the correct wedge block
with the correct hole pattern. See
Figure 22
and
Figure
23).
Figure
19).
Figure
20.
CLCH-SVX07C-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents