Trane Performance Climate Changer Installation, Operation And Maintenance Manual page 45

Performance climate changer air handlers
Table of Contents

Advertisement

4. Install 3/8-inch x 3/8-inch white butyl tape to flanged side of pipe cabinet wall and remove paper
Figure 29. Pipe cabinet installation
5. Lift cabinet into place on to pipe cabinet curb.
6. Slide pipe cabinet tight up against the sidewall of the air handler.
7. Check pipe cabinet side walls to ensure they are plumb.
8. Apply a bead of caulk along the corner between the pipe cabinet and air handler wall prior to
CLCH-SVX07C-EN
backing from tape. See
Figure
installing connecting angle.
29.
Installation - Mechanical
Butyl tape
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents