8. Initialization Method
The setting procedures in this document are based on the factory default settings.
Some settings may not be applicable unless you use the devices with the factory default
settings.
8.1. Initializing PLC
To initialize the PLC settings, it is necessary to initialize EtherNet/IP Unit and CPU Unit.
Change the operating mode of PLC to PROGRAM mode before the initialization.
8.1.1.
EtherNet/IP Unit
To initialize the EtherNet/IP Unit settings, select Edit - I/O Table and Unit Setup from the PLC
Menu in CX-Programmer, and follow the steps below.
(1)Right-click EtherNet/IP Unit in the PLC IO Table Window and select Unit Setup from the
menu.
(2)Click Restart in the Edit Parameters Dialog Box.
(3)An execution confirmation dialog box is displayed. Confirm that there is no problem, and
click Yes.
8.Initialization Method
48