Powering Up The Drive; Powering Up The Drive; Powering Up The Drive And Operation Status Display - YASKAWA T1000A Technical Manual

Table of Contents

Advertisement

4.5 Powering Up the Drive

4.5

Powering Up the Drive

u Powering Up the Drive and Operation Status Display
n
Powering Up the Drive
Review the following checklist before turning the power on.
Item to Check
Power supply voltage
Drive output terminals and motor
terminals
Control circuit terminals
Drive control terminal status
Status of the load and connected
machinery
n
Status Display
When the power supply to the drive is turned on, the digital operator lights will appear as follows:
No.
Normal Operation
Fault
External fault (example)
86
Ensure the power supply voltage is correct:
200 V class: 3-phase 200 to 240 Vac 50/60 Hz
400 V class: 3-phase 380 to 480 Vac 50/60 Hz
Properly wire the power supply input terminals (R/L1, S/L2, T/L3).
Check for proper grounding of drive and motor.
Properly wire drive output terminals U/T1, V/T2, and W/T3 with motor terminals U, V, and W.
Check control circuit terminal connections.
Open all control circuit terminals (off).
Decouple the motor from the load.
Name
ALM
DIGITAL OPERATOR JVOP-182
DRV
REV
DRV
FOUT
The data display area displays the frequency reference.
ALM
ALM
DIGITAL OPERATOR JVOP-182
DRV
REV
DRV
FOUT
Data displayed varies by the type of fault. Refer to Fault Displays, Causes, and Possible Solutions on page 277
for more information and possible solution.
Description
YASKAWA ELECTRIC SIEP C710616 30B YASKAWA AC Drive T1000A Technical Manual
Description
is lit.
and
are lit.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents