Brother QL-1060N Service Manual page 60

P-touch
Hide thumbs Also See for QL-1060N:
Table of Contents

Advertisement

(9) Assemble the double gear A with the retaining ring E2.5.
(10) Assemble the double gear B with the retaining ring E4.
(11) Assemble the double gear C.
Note: Confirm that the hook of the double gear C is securely hooked on.
Chassis R sub ASSY
Double gear B
Retaining ring E4
Double gear C
Retaining ring E2.5
Double gear A
Reassembling the Mecha ASSY (8)
Fig. 3.2-8
(12) Assemble the two platen supports.
Platen support
Pin
Pin
Chassis L sub ASSY
Chassis R sub ASSY
Fig. 3.2-9 Reassembling the Mecha ASSY (9)
III- 32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents