Propeller Shaft Bearing Housing And Gear Installation - BRP E200HSLSEA Service Manual

Evinture e-tec. 200 hp,225 hp,250 hp,300 hp, 90 grd. v6
Table of Contents

Advertisement

GEARCASE ASSEMBLY
Water Intake Screens
Install water intake screens. Tighten screws to a
torque of 60 to 84 in. lbs. (7 to 9.5 N·m).
1. Water intake screen
Shift Housing, Gear, and
Propeller Shaft Installation
Push shifter detent into farthest downward posi-
tion. Tip the rear of the gearcase slightly down-
ward to assist in the installation of the shaft
assembly.
Be sure the thrust bearing and the thrust washer
are in the proper position. Insert the shaft assem-
bly fully into the gearcase while aligning shift
housing pin with hole in forward end of gearcase
housing.
1
1. Pin
GEARCASE – COUNTER ROTATION
Shift Rod Cover
Refer to Shift Rod Cover on p. 311
Pinion Gear and Driveshaft
Installation
Refer to Pinion Gear and Driveshaft Installation
on p. 312.
Propeller Shaft Bearing
1
Housing and Gear Installation –
"M2" Type
IMPORTANT:
ing on "M2" type gearcases is PRESSED into the
gearcase housing.
Lightly apply Triple Guard Grease to new bearing
006886
housing O-rings. Install O-rings in grooves in the
housing. Grease the machined side surfaces of
bearing housing.
Place bearing housing in gearcase.
006929
GEARCASE ASSEMBLY
The propeller shaft bearing hous-
006846
13
327

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents