NEC NC1700L Installation Manual page 70

Dlp cinema projector, chiller unit
Hide thumbs Also See for NC1700L:
Table of Contents

Advertisement

Setting Up Your Projector and Chiller Unit
4
Raise the arm of the ground terminal.
Loosen the grounding terminal screw with a flathead screwdriver and lift the arm.
5
Insert the ground cable into the ground terminal.
Insert the crimp terminal of the ground cable to the connecting terminal of the ground terminal.
WARNING
Firmly tighten the ground cable to the connecting terminal. After tightening all screws, check that all power cables are
properly tightened and in place. If the screws are not firmly tightened, this may cause serious personal injury or even death.
6
Return the arm in the reverse procedure, screw the ground terminal.
Return the arm and tighten the screw of the ground terminal with a flathead screwdriver.
7
Install the cover plate of the chiller unit.
Mount the cover plate, and secure with screws (four locations).
70
Arm
Screw
Connecting terminal

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Np-17cu01

Table of Contents