Powerware 9330 Installation And Operation Manual page 206

10 kva -- 20 kva 25 kva -- 40 kva
Table of Contents

Advertisement

I/O
CABINET
GND
A
B
C
MAINS IN
480V
(208V,600V
OPTIONAL)
GND
ILSCO
4- -POLE
GND BLK
A
B
C
GND
BYPASS IN
480V
(208V,600V
OPTIONAL)
OPTIONAL
42 CIRCUIT
GND
DISTRIBUTION
L1
L2
L3
A
B
C
AC LOAD OUT
480V
(208V,600V
OPTIONAL)
N
GND
CONFIGURATION 1
DUAL FEED; DUAL INPUT TRANSFORMERS;
BYPASS SWITCH; WITH DISTRIBUTION
CONFIGURATION 12
SINGLE FEED; INPUT TRANSFORMER;
BYPASS SWITCH; WITH DISTRIBUTION
A ---36
X2
H2
H21
H22
H23
X1
H1
H11
H12
H13
MAIN ISO
XFMR
X2
H2
H21
H22
H23
X1
H1
H11
H12
H13
BYPASS
ISO XFMR
N
CB2
OUTPUT
BREAKER
2
1
4
3
6
5
150A
UPS SYSTEM OPTIONS CABINET CONFIGURATIONS
POWERWARE 9330 (25 kVA---40 kVA)
CONFIGURATION 2
DUAL FEED; DUAL INPUT TRANSFORMERS;
BYPASS SWITCH; WITHOUT DISTRIBUTION
CONFIGURATION 13
SINGLE FEED; INPUT TRANSFORMER;
BYPASS SWITCH; WITHOUT DISTRIBUTION
OPTIONAL
BREAKER
1
H33
3
H32
H31
H3
5
X3
X0
H33
H32
H31
H3
X3
X0
3
4
1
7
8
5
11
12
9
SW1
EXT. WRAP
BYPASS
DESCRIPTION:
OPTIONS CABINET SCHEMATICS
DRAWING NO:
164201300---7
REVISION:
F
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
INTER- -
CABINET
WIRING
CB1
INPUT
2
4
6
150A
CB3
BYPASS
BREAKER
150A
1
2
3
4
5
6
SHEET:
6 of 10
DATE:
111501
164201300 REV. G 061502
UPS
CABINET
A
B
C
MAINS
IN
GND
A
B
C
BYPASS
IN
N
GND
A
B
C
N
AC LOADS
OUT
GND

Advertisement

Table of Contents
loading

Table of Contents