Powerware 9330 Installation And Operation Manual page 205

10 kva -- 20 kva 25 kva -- 40 kva
Table of Contents

Advertisement

I/O
CABINET
GND
A
B
C
MAINS IN
480V
(208V,600V
OPTIONAL)
GND
ILSCO
4- -POLE
GND BLK
A
B
BYPASS
IN
208V
C
GND
OPTIONAL
42 CIRCUIT
DISTRIBUTION
GND
L1
L2 L3
A
2
AC LOADS
OUT
B
4
208/120V
OR
480V
C
6
W/O
DISTRIBUTION
N
NEUTRAL TO
GND
GND BOND
CONFIGURATION 16
DUAL FEED; INPUT AND OUTPUT TRANSFORMERS;
BYPASS SWITCH; WITH DISTRIBUTION
CONFIGURATION 17
DUAL FEED; INPUT AND OUTPUT TRANSFORMERS;
BYPASS SWITCH; WITHOUT DISTRIBUTION
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
164201300 REV. G 061502
X2
H2
H21
H22
H23
X1
H1
H11
H12
H13
MAIN ISO
XFMR
N
CB2
OUTPUT
BREAKER
1
N/C
3
5
N/C
70A
N/C
UPS SYSTEM OPTIONS CABINET CONFIGURATIONS
POWERWARE 9330 (10 kVA---20 kVA)
H33
H32
H31
H3
X3
X0
CB3
BYPASS
BREAKER
1
2
3
4
5
6
70A
1
H2
X0
X21
H31
X22
H3
H11
X11
H1
X12
H21
X31
OUTPUT
X32
XFMR
DESCRIPTION:
DRAWING NO:
REVISION:
CB1
INPUT
BREAKER
1
2
3
4
5
6
70A
B1
B2
2
1 2
EXT. WRAP
BYPASS
3
4
1
7
8
5
11
12
9
SW1
OPTIONS CABINET SCHEMATICS
164201300---7
DATE:
F
INTER- -
UPS
CABINET
CABINET
WIRING
A
B
MAINS
IN
C
MAINS
IN
GND
A
B
BYPASS
IN
C
AC LOADS
OUT
A
B
C
N
GND
SHEET:
5 of 10
111501
A ---35

Advertisement

Table of Contents
loading

Table of Contents