Powerware 9330 Installation And Operation Manual page 204

10 kva -- 20 kva 25 kva -- 40 kva
Table of Contents

Advertisement

I/O
CABINET
GND
A
MAINS
IN
B
N/C
C
GND
ILSCO
4- -POLE
GND BLK
A
B
BYPASS
IN
480V
C
(208V,600V
OPTIONAL)
N
GND
OPTIONAL
42 CIRCUIT
GND
DISTRIBUTION
N
L1
L2 L3
BREAKER
A
2
AC LOADS
OUT
B
4
208/120V
OR
480V
C
6
W/O
DISTRIBUTION
N
GND
NEUTRAL TO
GND BOND
CONFIGURATION 8
SINGLE FEED; INPUT AND OUTPUT TRANSFORMERS;
BYPASS SWITCH; WITH DISTRIBUTION
CONFIGURATION 9
SINGLE FEED; INPUT AND OUTPUT TRANSFORMERS;
BYPASS SWITCH; WITHOUT DISTRIBUTION
A ---34
X2
H2
H21
H22
H23
X1
H1
H11
H12
H13
MAIN ISO
X0
CB2
X21
OUTPUT
1
X22
N/C
3
X11
5
X12
N/C
70A
X31
X32
N/C
UPS SYSTEM OPTIONS CABINET CONFIGURATIONS
POWERWARE 9330 (10 kVA---20 kVA)
H33
H32
H31
H3
X3
X0
XFMR
1
H2
H31
H3
H11
H1
H21
OUTPUT
XFMR
DESCRIPTION:
DRAWING NO:
REVISION:
CB1
INPUT
BREAKER
1
2
3
4
5
6
70A
B1
B2
2
1 2
EXT. WRAP
BYPASS
3
4
1
7
8
5
11
12
9
SW1
OPTIONS CABINET SCHEMATICS
164201300---7
DATE:
F
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
UPS
INTER- -
CABINET
CABINET
WIRING
MAINS
IN
A
B
C
GND
BYPASS
IN
A
B
C
N
GND
AC LOADS
OUT
A
B
C
N
GND
SHEET:
4 of 10
111501
164201300 REV. G 061502

Advertisement

Table of Contents
loading

Table of Contents