The table below shows the minimum height requirements, fireplace included,
according to the number of elbows:
chimney
number of elbows
straight installation
-
1 - 15° offset
2 - 15° elbows
2 - 15° offset
4 - 15° elbows
1 - 30° offset
2 - 30° elbows
2 - 30° offset
4 - 30° elbows
* 1 - 45° offset
* 2 - 45° elbows
* 2 - 45° offset
* 4 - 45° elbows
* permitted only in Canada
Refer to building code to make sure the installation seals the penetration
of the building enbelope or refer tot he listed chimney installation manual.

4.3.3. CHIMNEY INSTALLATION INSTRUCTIONS

1. Cut and frame the holes in the ceiling, floor and roof where the chimney
will pass and install radiation shields (see figure X). Use a plumb bob to line
up the center of the holes. Make sure that the size of the floor and ceiling
holes are in accordance with the chimney manufacturer's instructions.
chimney
roof
2" min
minimum height
15' (4.6 m)
15' (4.6 m)
18' (5.5 m)
15' (4.6 m)
20' (6.1 m)
16' (4.9 m)
23' (7.0 m)
ceiling
roof radiation
shield
2. From below, install a firestop supplied by the chimney manufacturer in
each ceiling/floor separation through which the chimney will pass. At the
attic level, install an attic radiation shield from above.
3. Follow the chimney's manufacturers' instructions and place the first
chimney length on he fireplace. For all chimneys, you must use an anchor
plate supplied by the chimney manufacturer before installing the first chim-
ney length (see figure 24). Continue installing chimney lengths making sure
to lock each length in place.
4. Every time the chimney passes through a ceiling or a wall, install the
appropriate firestop. When you reach the desired height, install the roof
support. (Refer to instructions included with the support.
5. Then, put the roof flashing in place and seal the joint between the roof
and the flashing with roofing pitch (see figures 24). For sloping roofs, place
the flashing under the upper shingles and on top of the lower shingles. Nail
the flashing to the roof, using roofing nails.
6. Place the storm collar over the flashing, and tighten it with the bolt
supplied. Finally, seal the joint between the storm collar and the chimney,
using silicone caulking.
7. Install the chimney cap.
8. When a ventilated roof flashing is installed, precautions are to be taken
not to caulk or seal the ventilating openings.