Rack Mounting - Planet GS-4210-16T2S User Manual

16/24-port 10/100/1000t + 2/4-port 100/1000x sfp managed switch gs-4210 series
Table of Contents

Advertisement

Supplying power to the Managed Switch.
Step 5:
Connect one end of the power cable to the Managed Switch and the power plug of the power cable to a standard wall
outlet. When the Managed Switch receives power, the Power LED should remain solid Green.

2.2.2 Rack Mounting

To install the Managed Switch in a 19-inch standard rack, please follow the instructions described below.
Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step1:
Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.
Step2:
Figure 2-1-15
shows how to attach brackets to one side of the Managed Switch.
Secure the brackets tightly.
Step 3:
Follow the same steps to attach the second bracket to the opposite side.
Step 4:
After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the
Step 5:
as shown in
Figure
User's Manual of GS-4210-16T2S_24T2S_16P2S_24P2S_48T4S
Figure 2-1-15: Attach Brackets to the Managed Switch
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
2-1-16.
35
rack,

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-4210-24t2sGs-4210-16p2sGs-4210-24p2sGs-4210-48t4s

Table of Contents