4.12 Test Run Checklist

Review the checklist before performing a test run. Check each item that applies.
No.
1
Thoroughly read the manual before performing a test run.
2
Turn the power on.
3
Set the voltage for the power supply to E1-01.
Check the items that correspond to the control mode being used.
WARNING! Sudden Movement Hazard. Ensure start/stop and safety circuits are wired properly and in the correct state before energizing
the drive. Failure to comply could result in death or serious injury from moving equipment. When programmed for 3-Wire control, a momentary
closure on terminal S1 may cause the drive to start.
No.
V/f Control (A1-02 = 0)
4
Select the best V/f pattern according to the application and motor characteristics.
5
Perform Rotational Auto-Tuning for V/f Control if using Energy Saving functions.
Open Loop Vector Control for PM (A1-02 = 5)
6
Perform Auto-Tuning as described.
YASKAWA ELECTRIC TOEP C710616 45F YASKAWA AC Drive – Z1000 User Manual
Checklist
Checklist

4.12 Test Run Checklist

Page
123
134
Page
143
143
155
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents