4.13 Test Run Checklist

4.13 Test Run Checklist
Review the checklist before performing a test run. Check each item that applies.
WARNING! Ensure start/stop and safety circuits are wired properly and in the correct state before energizing the drive. Failure to comply
could result in death or serious injury from moving equipment. When programmed for 3-Wire control, a momentary closure on terminal S1
may cause the drive to start.
No.
1
Thoroughly read the manual before performing a test run.
2
Turn the power on.
3
Set the voltage for the power supply to E1-01.
Select the best V/f pattern according to the application and motor characteristics.
4
Example: If using a motor with a rated frequency of 60.0 Hz, set E1-03 to "1".
5
The
If the motor rotates in the opposite direction during the test run, switch two of the drive output terminals (U/T1,
6
V/T2, W/T3).
If the control circuit terminals should supply the frequency reference, select the correct voltage input signal level
7
(0 to 10 V) or the correct current input signal level (4 to 20 mA or 0 to 20 mA).
8
Set the proper voltage to terminal A1. (0 to 10 V).
9
Set the proper current to terminal A2. (4 to 20 mA or 0 to 20 mA).
10
When current input is used, set H3-09 to "2" (4 to 20 mA) or "3" (0 to 20 mA) and set H3-10 to "0".
11
When current input is used, switch the drive built-in DIP switch S1 from the V-side (OFF) to I-side (ON).
108
should illuminate after giving a run command using the AUTO key.
Checklist
YASKAWA TOEP YAIQPM 03B YASKAWA AC Drive - iQpump Micro User Manual
Page
68
155
68
68
115
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents