Telco Rack - Supero SUPERSERVER 5018A-TN4 User Manual

Table of Contents

Advertisement

Stability hazard. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the floor before you slide the unit out for servicing.
Failure to stabilize the rack can cause the rack to tip over.

Telco Rack

The SC504 supports Telco Rack installation. The compact design of the SC504
chassis allows it to be installed into a Telco rack without the use of rails.
Figure 2-2. Installing the Chassis into a Telco Rack
Note: the figures are for illustrative purposes only. Always install servers to the
bottom of a rack first.
Warning: do not pick up the server with the front handles. They are de-
signed to pull the system from a rack only.
Chapter 2: Server Installation
2-5

Advertisement

Table of Contents
loading

Table of Contents