Crankshaft - Turn; Piston Installation - Prepare; Upper Connecting Rod Bearing - Install - Mitsubishi S6R Series Service Manual

Hide thumbs Also See for S6R Series:
Table of Contents

Advertisement

Chapter 7 ASSEMBLY OF BASIC ENGINE

2.8 Crankshaft - Turn

(1) Install two bolts to the flywheel mounting holes of the
crankshaft.
(2) Using the bolts, turn the crankshaft with a bar.

2.9 Piston Installation - Prepare

(1) Turn the crankshaft to a position where the connecting
rod big end does not hit the crankpin on the piston
installing.
(2) Clean the cylinder liner inner surface and the crankpin,
and apply engine oil to the cylinder liner.

2.10 Upper Connecting Rod Bearing - Install

Be careful not to put engine oil on the back face of
upper connecting rod bearing.
Install the upper connecting rod bearing into connecting rod
big end aligning the lug and lug slot. Apply engine oil to the
sliding surface. Verify the alignment of the oil hole of con-
necting rod and the oil hole of bearing.
7-12
Crankshaft - Turn
Position so that connecting
rod big-end does not hit crankpin
Position of Crankpin - Adjust
Piston Installation - Prepare
Upper connecting rod bearing
Lug groove
Oil hole
Upper Connecting Rod Bearing - Install
Crankshaft
M22 × 1.5 mm
Crankpin

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6r2 series

Table of Contents