Dodge RAM 1500 1998 Owner's Manual page 1790

Table of Contents

Advertisement

DR
SHIFT MECHANISM (Continued)
Fig. 137 EXPANSION PLUG LOCATION
1 - EXPANSION PLUGS
(3) Clean all chips from shift cover and plug bores.
Then clean plug bores with solvent and dry with
clean shop towel.
INSTALLATION
EXPANSION PLUG
(1) Apply small bead of Mopar silicone sealer or
equivalent to outer edge of each new plug.
(2) Position each plug in bore and tap into place
with hammer and punch or socket.
FIFTH-REVERSE SHIFT FORK PADS
(1) Align pad locating tab.
(2) Snap pads into place and verify locating tabs
are locked-in.
SHIFT COVER
(1) Clean mating surfaces of shift mechanism
cover and gear case with wax and grease remover.
(2) Apply a small amount of Mopar silicone sealer or
equivalent to sealing surface of shift mechanism cover.
CAUTION: Do not use an excessive amount sealer.
Excess can squeezed into gear case and could
block lubricant feed holes in time.
(3) Lubricate synchro sleeves with Castrol
torq gear lubricant or equivalent. Then apply light
coat of petroleum jelly to shift fork contact surfaces.
(4) Verify shift fork pads (Fig. 138) are secure.
(5) Verify 1-2 and 3-4 synchro sleeves and forks in
shift cover are in neutral position.
(6) Align and seat shift mechanism cover on trans-
mission.
NOTE: If cover will not seat, it may not be aligned
on gear case dowels or shift forks are not aligned
with sleeves and shift lug.
(7) Apply Mopar Lock N' Seal or equivalent to
threads of shift cover bolts.
(8) Install shift cover mechanism bolts and tighten
to 27-31 N·m (216-276 in. lbs.).
MANUAL TRANSMISSION - NV4500
Fig. 138 SHIFT FORK PAD
1 - SHIFT FORK PADS
2 - FIFTH-REVERSE FORK
(9) Apply sealer to backup lamp switch. Install switch
into cover and tighten to 22-34 N·m (193-265 in. lbs.).
(10) Install vent assembly if removed. Apply an
adhesive/sealer to vent tube to help secure it in cover.
(11) Install transmission.
SHIFT COVER
REMOVAL
(1) Shift transmission into Neutral.
(2) Unscrew and remove the shift lever extension
from the shift
(3) Remove screws attaching shift boot to floorpan.
Then slide boot upward on the shift lever.
(4) Remove the bolts holding the shift tower to the
isolator plate and transmission shift cover.
(5) Remove the shift tower and isolator plate from
the transmission shift cover.
INSTALLATION
(1) Clean the mating surfaces of shift tower, isola-
Syn-
tor plate and shift cover with suitable wax and
grease remover.
(2) Apply Mopar Gasket Maker or equivalent to
the sealing surface of the shift cover. Do not over
apply sealant.
(3) Install the isolator plate onto the shift cover,
metal side down.
(4) Install the shift tower onto the isolator plate.
No sealant is necessary between the shift tower and
the isolator plate.
(5) Verify shift tower, isolator plate and shift tower
bushings are properly aligned.
(6) Install bolts to hold the shift tower to the iso-
lator plate and the shift cover. Tighten the shift
tower bolts to 10.2-11.25 N·m (7.5-8.3 ft. lbs.).
(7) Install shift lever extension, shift boot and bezel.
21 - 87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1997 ram 1500

Table of Contents