Quick Start
H3C S5100-SI/EI Series Ethernet Switches
The dedicated stack cables for the S5100-EI series are available
in three length specifications: 0.5 m (1.6 ft.), 1 m (3.3 ft.), and 3 m (9.8
ft.). You can choose the cables according to the specific needs.
3.8.2 Installation
Note:
Before installing a dedicated stack cable, you need to install 10GE
stack cards.
Step 1: Put on an ESD-preventive wrist strap and verify the
ESD-preventive wrist strap properly grounded. Then take out the
dedicated stack cable from the package.
Step 2: Insert the plugs of the dedicated stack cable horizontally
into the 10GE stack ports of the switches, paying attention to the
directions of the plugs.
Step 3: Tighten the fastening screws at both sides of the stack
cable plugs using a flathead screwdriver or an electric screwdriver.
3.8.3 Removal
Step 1: Put on an ESD-preventive wrist strap and verify the
ESD-preventive wrist strap properly grounded.
Step 2: Loosen the fastening screws at both sides of the stack
cable plugs using a flathead screwdriver or an electric screwdriver.
Chapter 3 Installing the Switch
3-43