Daikin ERQ Service Manual page 79

Erq 100/125/140 a7v1b (outdoor unit) ekeqd/f/mcbv3 (control box) ekexv 50/63/80/100/125/140 (expansion valve kit)
Hide thumbs Also See for ERQ:
Table of Contents

Advertisement

M
AINTENANCE
Only a qualified service person is allowed to perform
maintenance.
Before obtaining access to terminal devices, all power
supply circuits must be interrupted.
Water or detergent may deteriorate the insulation of
electronic components and result in burn-out of these
components.
D
ISPOSAL REQUIREMENTS
Dismantling of the unit, treatment of the refrigerant, of oil and of other
parts must be done in accordance with relevant local and national
legislation.
EKEQFCBV3 + EKEQDCBV3
Option kit for combination of Daikin condensing units
with field supplied air handling units
4PW52446-1
N
OTES
: http://splitoff.ru/tehn-doc.html
Installation and operation manual
69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents