Daikin ERQ Service Manual page 76

Erq 100/125/140 a7v1b (outdoor unit) ekeqd/f/mcbv3 (control box) ekexv 50/63/80/100/125/140 (expansion valve kit)
Hide thumbs Also See for ERQ:
Table of Contents

Advertisement

Installation of longer thermistor cable (R1T/R2T/R3T)
The thermistor is supplied with a standard cable of 2.5 m. This cable
can be made longer to up to 20 m.
Install the longer thermistor cable with the delivered wire to wire
splices
1
Cut the wire or bundle the remainder of the thermistor cable.
Keep at least 1 m of the original thermistor cable.
Do not bundle the cable inside the control box.
2
Strip the wire ±7 mm at both ends and insert these ends into the
wire to wire splice.
3
Pinch the splice with the correct crimp tool (pliers).
4
After connection, heat up the shrink-insulation of the wire to wire
splice with a shrink-heater to make a water tight connection.
5
Wrap electrical insulation tape around the connection.
6
Put a pull-relief in front of and behind the connection.
The connection must be made on an accessible
location.
To make the connection waterproof, the connection
can also be made in a switch box or connector box.
The thermistor cable should be located at least
50 mm away from power supply wire. Not following
this guideline may result in malfunction due to
electrical noise.
R
EFRIGERANT PIPING WORK
All field piping must be provided by a licensed refrigeration
technician and must comply with the relevant local and
national codes.
For refrigerant piping of outdoor unit, refer to the installation
manual supplied with the outdoor unit.
Follow the outdoor unit specifications for additional charging,
piping diameter and installation.
The maximum allowed piping length depends on the connected
outdoor model.
T
EST OPERATION
Before executing "test operation" as well as before operating the unit,
you must check the following:
Refer to the section of "For the following items, take special care
during construction and check after installation is finished" on
page 60.
After finishing the construction of refrigerant piping, drain piping
and electric wiring, conduct test operation accordingly to protect
the unit.
Open the gas side stop valve.
Open the liquid side stop valve.
Executing the test operation
1
Close the contact T1/T2 (ON/OFF).
2
Confirm function of the unit according to the manual and check if
the air handling unit has collected ice (freeze-up).
If the unit collects ice: see "Troubleshooting" on page 68.
3
Confirm that the fan of the air handling unit is ON.
Installation and operation manual
66
In case of poor distribution in the air handling unit, 1 or
more passes of the air handling unit may freeze-up
(collect ice) ➞ put the thermistor (R2T) on this
position.
Depending on operation conditions (e.g.: outdoor
ambient temperature) it is possible that the settings
must be changed after commissioning.
O
PERATION AND MAINTENANCE
If T1/T2 is applicable:
Closing the T1/T2 signal starts operation of the air handling unit.
Opening the T1/T2 signal stops operation of the air handling
unit.
W
HAT TO DO BEFORE OPERATION
Before initiating operation, contact your dealer to get
the operation manual that corresponds to your
system.
Refer to the dedicated manual of the controller (field
supply) and air handling unit (field supply).
Make sure that the air handling unit fan is ON when
the outdoor unit is in normal operation.
Field settings for EKEQDCB
Refer to the installation manuals of both the outdoor unit and the
remote controller.
Field settings for EKEQFCB
When changing the settings:
1
Make the required settings.
2
Turn power OFF.
3
Remove the remote controller after servicing and checking the
system in cooling mode. Operating the remote controller may
disturb the normal operation of the system.
4
Do not change T1/T2 during power failure.
5
Put power of indoor and outdoor unit ON.
Setting the temperature control system
Mode No.
Code No.
01
13(23)–0
02
or SST = evaporating temperature or saturated suction
T
e
temperature.
= condensing temperature.
T
c
Option kit for combination of Daikin condensing units
: http://splitoff.ru/tehn-doc.html
Description of setting
Operation with 0–10 V capacity
control (= factory setting)
Operation with fixed T
/T
e
c
temperature control
EKEQFCBV3 + EKEQDCBV3
with field supplied air handling units
4PW52446-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents