Daikin ERQ Service Manual page 123

Erq 100/125/140 a7v1b (outdoor unit) ekeqd/f/mcbv3 (control box) ekexv 50/63/80/100/125/140 (expansion valve kit)
Hide thumbs Also See for ERQ:
Table of Contents

Advertisement

ESIE09-05
Detailed Setting Procedure of Low Noise Operation and Demand Control
1. Setting mode 1 (H1P off)
2. Setting mode 2 (H1P on)
Test Operation
In setting mode 2, push the BS1 (MODE button) one time. → Setting mode 1 is entered and
H1P off.
During the setting mode 1 is displayed, "In low noise operation" and "In demand control" are
displayed.
In setting 1, push and hold the BS1 (MODE button) for more than 5 seconds. → Setting mode
2 is entered and H1P lights.
Push the BS2 (SET button) several times and match the LED display with the Setting No.
you want.
Push the BS3 (RETURN button) one time, and the present setting content is displayed.
→ Push the BS2 (SET button) several times and match the LED display with the setting
content (as shown on next page) you want.
Push the BS3 (RETURN button) two times. → Returns to
Push the BS1 (MODE button) one time. → Returns to the setting mode 1 and turns H1P off.
.
: http://splitoff.ru/tehn-doc.html
Field Setting
113

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents