3.3 Possible settings for function D and E
For function D (
L.N.O.P
level 2< level 1 (
).
1
For function E (
DEMAND
level 1< level 2 < level 3 (
H1P H2P H3P H4P H5P H6P H7P
w x x x x x c
1
w x x x x c x
(*)
2
w x x x c x x
3
(*) This setting = factory setting.
4
Push the
button and the setting is defined.
BS3 RETURN
5
When the
button is pushed again, the operation
BS3 RETURN
starts according to the setting.
Refer to the service manual for more details and for other settings.
NOTE
When finished, please mark the settings of function C,
D and E in the "Records" part of the label on the
backside of the front plate.
Confirmation of the set mode
The following items can be confirmed by setting mode 1 (H1P
led is off)
Check the led indication in the field marked
1
Indication of the present operation state
x
normal
w
abnormal
c
under preparation or under test operation
H1P H2P H3P H4P H5P H6P H7P
x x w x x x x
2
Indication of COOL/HEAT selection setting
1
When set to COOL/HEAT change-over by each individual outdoor
unit circuit (= factory setting).
H1P H2P H3P H4P H5P H6P H7P
x x w x x x x
(*)
1
(*) This setting = factory setting.
3
Indication of low noise operation state
x
standard operation (= factory setting)
w
operation
L.N.O.P
H1P H2P H3P H4P H5P H6P H7P
x x w x x x x
4
Indication of power consumption limitation setting
x
standard operation (= factory setting)
w
operation
DEMAND
H1P H2P H3P H4P H5P H6P H7P
x x w x x x x
ERQ100~140A7V1B
Inverter condensing unit
4PW51321-1
) only: the noise of level 3<
) only: the power consumption of
).
3
.
L.N.O.P
DEMAND

12.4. Test operation

After turning on the power supply, the unit can not
NOTE
be started until the H2P initialisation led goes off
(maximum 12 minutes).
Depending on the application, it is possible that
the remote controller is required for performing
settings during first installation and servicing only
(service tool).
Check the stop valves
Make sure to open the gas and liquid line stop valves.
After installation, perform the test operation.
Unless the test operation is performed, the error code "U3" is
shown on the remote controller and the unit cannot be operated.
Performing the test operation
1
To protect the compressor, make sure to turn on the power
supply 6 hours before starting operation.
2
Set to setting mode 1 (H1P led is off) (refer to "Setting mode 1"
on page 136).
3
Press the
button for 5 seconds when the unit is at a
BS4 TEST
standstill. The test operation starts when the H2P led blinks and
the remote controller indicates
(external control).
It may take 10 minutes to bring the state of refrigerant uniform
before the compressor starts, but that is not a malfunction.
The test operation is automatically carried out in cooling mode
during 15~30 minutes.
Depending on the situation, the refrigerant running sound or the
sound of a magnetic solenoid valve may rise during this
operation.
The following items are automatically checked:
-
Check for incorrect wiring
-
Check if stop valves are open
-
Check of refrigerant charge
-
Automatic judgement of piping length
When you want to terminate the test operation,
NOTE
press the
BS3 RETURN
running for 30 seconds and then stops. During
test operation it is impossible to stop the unit with
the remote controller.
4
After the test operation (maximum 30 minutes), the unit
automatically stops. Check the operation results by the outdoor
unit led indication.
H1P H2P H3P H4P H5P H6P H7P
x x w x x x x
normal
x w x x x x x
abnormal
The led indication changes during this operation, but
that is not abnormal.
Please attach the front plate of the outdoor unit in
order to prevent electric shocks.
: http://splitoff.ru/tehn-doc.html
(test operation) and
button. The unit will keep
Installation manual
137

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents