installation
|
30
8. Slide the appliance and vent assembly
towards the wall carefully inserting the
vent pipe into the vent cap assembly. It is
important that the vent pipe extends into the
vent cap sufficient distance so as to result
in a minimum pipe overlap of 1-1/4 inches.
Secure the connection between the vent
pipe and the vent cap 3 sheet metal screws.
9. Install wall thimble in the center of the
10" square and attach with wood screws
(Diagram 4..
Diagram 4
UNIT INSTALLATION WITH
VERTICAL
TERMINATION
1. Maintain the 1-1/2" clearances (air spaces)
to combustibles when passing through
ceilings, walls, roofs, enclosures, attic rafter,
or other nearby combustible surfaces. Do
not pack air spaces with insulation. Check
"Venting" Sections for the maximum vertical
rise of the venting system and
the maximum horizontal offset
limitations.
2. Set the gas appliance in its
desired location. Drop a plumb
bob down from the ceiling to the
position of the appliance flue exit,
and mark the location where the
vent will penetrate the ceiling.
Drill a small hole at this point.
Next, drop a plumb bob from the
roof to the hole previously
drilled in the ceiling, and
mark the spot where the
vent will penetrate the roof.
3. A Firestop spacer must be installed in the
floor or ceiling of every level. To install the
Firestop spacer in a flat ceiling or wall, cut
a 10 inch square hole. Frame the hole as
shown in Diagram 2 and install the firestop.
Diagram 2
30 |
®
Horizon
HZ33CE-10 Gas Fireplace
4. Assemble the desired lengths of pipe and
elbows. Ensure that all pipes and elbow
connections are in the fully twist-locked
position and sealed.
NOTE:
For best results and optimum
performance with each approved venting
system, it is highly recommended to apply
"Mill-Pac" sealant (supplied) to every inner
pipe connection. Failure to do so may result
in drafting or performance issues not covered
under warranty.
5. Cut a hole in the roof centered on the small
drilled hole placed in the roof in Step 2. The
hole should be of sufficient size to meet
the minimum requirements for clearance
to combustibles of 1-1/2". Slip the flashing
under the shingles (shingles should overlap
half the flashing) as per Diagram 3.
Diagram 3: The upper half of the flashing is
installed under the roofing material and not
nailed down until the chimney is installed.
This allows for small adjustments.
6. Continue to assemble pipe lengths.
Note: If an offset is necessary in the attic to
avoid obstructions, it is important to
support the vent pipe every 3 feet, to
avoid excessive stress on the elbows,
and possible separation. Wall straps
are available for this purpose.
Diagram 1
Galvanized pipe is desirable above the roof line
due to its higher corrosion resistance. Continue
to add pipe sections through the flashing until
the height of the vent cap meets the minimum
height requirements specified in Dia. 4 or local
codes. Note that for steep roof pitches, the
vertical height must be increased. A poor
draft, or down drafting can result from high
wind conditions near big trees or adjoining
roof lines, in these cases, increasing the
vent height may solve the problem.
7. Ensure vent is vertical and secure the base
of the flashing to the roof with roofing rails,
slide storm collar over the pipe section and
seal with a mastic.
Diagram 4
Minimum Vent Height
Roof Pitch
Feet
flat to 7/12
2
over 7/12 to 8/12
2
over 8/12 to 9/12
2
over 9/12 to 10/12
2.5
over 10/12 to 11/12
3.25
over 11/12 to 12/12
4
over 12/12 to 14/12
5
over 14/12 to 16/12
6
over 16/12 to 18/12
7
over 18/12 to 20/12
7.5
over 20/12 to 21/12
8
8. Install the vertical termination cap by twist-
locking it.
Note: Any closets or storage spaces, which
the vent passes through must be
enclosed.
GAS LINE
INSTALLATION
The gas line is brought through the right side of
the appliance. The gas valve is situated on the
right hand side of the unit and the gas inlet is on
the right hand side of the valve.
The gas line connection may be made of rigid
pipe, copper pipe or an approved flex connector.
(If you are using rigid pipe, ensure that the valve
can be removed for servicing.) Since some
municipalities have additional local codes it is
always best to consult with your local authorities
and the CAN/CGA B149 installation code.
For USA installations follow local codes and/or the
current National Fuel Gas Code, ANSI Z223.1.
When using copper or flex connectors use only
approved fittings. Always provide a union so that
gas lines can be easily disconnected for servicing.
Flare nuts for copper lines and flex connectors
are usually considered to meet this requirement.
Important: Always check for gas leaks with a
soap and water solution or gas leak detector.
Do not use open flame for leak testing.
Meters
0.61
0.61
0.61
0.76
0.99
1.22
1.52
1.83
2.13
2.29
2.44