3.4 Operation

3.4 Operation

3.4.1 Pre-operation checks

Before starting operation, check the following:
• Safety
Perform test operation after making sure that safety is ensured if the machine should become out of
control.
• Machine
Make sure that the machine is free of damage.
• Parameters
Set the parameter values to match the operating machine system environment.
• Test operation
Perform test operation and make sure that the machine operates safely under light load at a low frequency.
After that, start operation.
OPERATION/CONTROL
58