Panel Mounting (Metal Box); Installation Kit; Removing And Installing The Enclosure Lid - Honeywell Galaxy 2 Series Installation Manual

Hide thumbs Also See for Galaxy 2 Series:
Table of Contents

Advertisement

Panel Mounting (cont'd)

Panel Mounting (Metal Box)

Installation Kit

The Galaxy 2 Series metal box comes with an installation kit. It contains two No.8 x 12 mm self-tapping lid
screws, 6160 Text Programming Overlay, two battery leads (one red and one black), 10 mm cable staple and
24, 1K resistors.
WARNING:
The lid of the metal box must not be removed before isolating the mains supply.
Illumination of the keypad power LED indicated the presence of a.c. mains supply.

Removing and Installing the Enclosure Lid

1. Remove the two self-tapping screws that secures the lid to the enclosure base.
2. Slide the lid forward on the locating slots then lift clear.
3. To install the lid, simply reverse the process.
NOTE: The top self-tapping screw activates the Lid Tamper Microswitch.
Enclosure
Earth
Connection
Transformer
Mains
Terminal block
with 200mA Fuse
Cable Tie
Mains Cable
Entry Hole
Mounting
Hole
ransformer Output
Lid Tamper
Lead to PCB
Microswitch
erminal Marked
Figure 17. Galaxy 2 Series Metal Box Layout
Galaxy 2 Series Installation Manual
Keyhole
Mounting
Slot
22
PCB
Cable
Entry
Cable
Entry
Mounting
Hole

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents