Electrical Work - Samsung AP30M1 Series User & Installation Manual

Table of Contents

Advertisement

Electrical work

The electrical work should be performed by a specialist qualified for the work.
f Use the three phase power supply, and be sure to install the sub power distributing board for exclusive use with the unit
f
(separately purchased by the user).
❋ ❋ Avoid multiple connecting wiring as it can cause a drop in voltage, thus resulting in poor performance of the automatic
control circuit.
f Be sure to install circuit breaker (separately purchased by the user).
f
f Be sure to connect the grounding wire.
f
The indoor unit is powered by the outdoor unit by means of a H07 RN-F connection cable (or a more power model), with
insulation in synthetic rubber and jacket in polychloroprene(neoprene), in accordance with the requirements of standard IEC
60335-2-40.
1. Remove the screw on the electrical component box and remove the cover plate.
2. Route the connection cord through the side of the indoor unit and connect the cable to terminals.
3. Route the other end of the cable to the outdoor unit through the ceiling & the hole on the wall.
4. Reassemble the electrical component box cover, carefully tightening the screw.
Wiring standard
Model
Power
Circuit breaker
Below 20m
Electric wire
Below 50m
Allowable voltage
Min. size of electric wires from/to the indoor/
outdoor units
• You must compress the solderless ring to the cable and then connect it to the main power terminal.
• Solderless ring selection
CAUTION
Thickness of cable (mm
Mirage_AP30M0@_IBIM_E_34518A(1).indd 41
Silver solder
)
2
2.5
Less than 9.5
4
Less than 9.5
AP30M0✴ Series / AP30M1✴ Series
1 phase, 220V-240V, 50Hz
Earth leakage circuit breaker(ELCB) 30A
2.5mm
2
4mm
2
198 V~242 V
0.75 mm
2
B (mm)
d2 (mm)
More than 4.5
More than 4.5
41
2012-02-01 오후 4:07:43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap30m0 series

Table of Contents