Post Adjustment Check; Install Spline Shaft - Toyota 3b Repair Manual

Hide thumbs Also See for 3b:
Table of Contents

Advertisement

FU-60
FUEL SYSTEM
-
lnjection Pump
17.
POST
ADJUSTMENT CHECK
(a)
Check
that injection
stops when
the fuel cut
solenoid
harness is removed.
Pump
revolution:
B,
38
1OO
rpm
118,
148
2OO
rpm
(b)
Check
the adjusting lever
movement.
B
36.5
-
46.50
38, 118,
148
38
-
480
(c)
Lock
the
maximum speed adjusting screw and full
load set screw
with
the wires as shown in the figure.
18.
INSTALL TWO FUEL PIPES
AND CLAMP
19.
INSTALL SPLINE SHAFT
(a)
lnstall the set key on the drive shaft.
(b)
Align the set key groove of the spline shaft with the
set
key.
(c)
Using SST, install
the
spline shaft
with the
spring
washer and round nut.
ssr
09260-58010 (09266-7601 1, 09278-46020\
Torque:
550
kg-cm (40
ft-lb, 54
N.m)
Maximum
Speed
Adjusting Screw
FU231
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

11b14bB

Table of Contents