Installing The Heat Sink; Concluding Steps - Fujitsu PRIMERGY RX1330 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX1330 M1:
Table of Contents

Advertisement

Processor

11.2.6 Installing the heat sink

Figure 150: Installing the heat sink
Ê Align the heat sink and fit it on the processor socket.
Ê Position the screws in the holes carefully, making sure they are upright.
Ê Fasten it in a crossover pattern with four screws according to the numbering
(torque 6.0 Nm, the description of this torque value doesn't apply to the
Japanese market). Notice the position of the air flow label.

11.2.7 Concluding steps

"Installing a riser module" on page 60
Ê
"Reassembling" on page 52
Ê
"Connecting the server to the mains" on page 55
Ê
I
If the Global Error LED is flashing with the error message "CPU has
been changed" on the display after the system is powered on, please
follow the steps below.
Ê Restart the system and wait until the screen output appears.
Ê Press [F2].
Ê If a password is assigned, enter this password and confirm with
[Enter].
The BIOS setup main menu will be displayed on the screen.
220
Upgrade and Maintenance Manual
RX1330 M1

Advertisement

Table of Contents
loading

Table of Contents