Installing An Fbu; Preliminary Steps - Fujitsu PRIMERGY RX1330 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX1330 M1:
Table of Contents

Advertisement

Expansion cards and backup units
Ê If the BBU is shown as bad or defective, do not power off the server for at
least 12 hours to allow the charge and calibration cycles to finish.
Ê If the BBU status does not change after 12 hours, please try to initiate the
recalibration process manually using the ServerView RAID Manager.
I
If this procedure still does not fix the BBU status, please contact your
local Fujitsu customer service partner.
9.5.2

Installing an FBU

Upgrade and Repair Unit
(URU)
Tools: Phillips PH1 / (+) No. 1 screw driver (for installing TFM)
9.5.2.1

Preliminary steps

"Disabling SVOM boot watchdog functionality" on page 64
Ê
"Shutting down the server" on page 45
Ê
"Disconnecting the server from the mains" on page 46
Ê
"Getting access to the component" on page 47
Ê
192
Upgrade and Maintenance Manual
Hardware: 15 minutes
RX1330 M1

Advertisement

Table of Contents
loading

Table of Contents