IMPORTANT SAFETY INSTRUCTIONS Save These Instructions! This manual contains important constructions that shall be followed during the installation and maintenance of the CyberPower Grid Tie Solar Inverter. CAUTION! Before installation and using the Inverter, read all About This Manual instructions and cautionary markings on the inverter and appropriate This purpose of this Installation &...
Installation CyperPower Grid Tie Solar Inverter The CyberPower Grid Tie Solar Inverter is designed to convert solar Inverter Location electric (photovoltaic or PV) power into utility-grade electricity that can be used by the home or sold to the local power company.
Page 5
Equipment and Installation Recommendation The maximum power point voltage of a string connect to the inverter should be a minimum of 250Vdc for CPSPV3600ETL model. If it is less Equipment recommendations than 250Vdc for CPSPV3600ETL model, the inverter will continue to...
This section includes the following topic: MPPT start Wiring The wires to AC terminal: voltage (Vdc) Acceptable wire size: For CPSPV3600ETL: From #12 AWG to #10 AWG (3mm to 6mm MPPT window 100~550 100~550 100~550 For CPSPV3000ETL: From #14 AWG to #12 AWG (2mm...