Lvps Pcb Unit - Konica Minolta bizhub 20 Service Manual

Hide thumbs Also See for bizhub 20:
Table of Contents

Advertisement

9.36 LVPS PCB Unit

(1) Turn the machine upside down.
(2) Remove the Screw pan (S/P washer) M3.5x7.5SR, and remove the NCU FG harness.
(3) Remove the five bind B M4x12 Taptite screws, and then remove the Base plate LV.
(4) Remove the Screw pan (S/P washer) M3.5x7.5SR from the Base plate LV to remove the
LVPS PCB unit terminal.
Screw pan (S/P washer) M3.5x6
NCU FG harmess
Base plate LV
<Back side>
Assembling Note:
• When assembling the Base plate LV, Direct the cable side of the LVPS PCB unit
terminal to the backward
illustration.), and align parallel the LVPS PCB unit terminal with the side of the Base
plate LV.
Fig. 5-165
(Fig.
5-165: To the direction of an arrow of the enlarged
5-129
Taptite bind B M4x12
LVPS PCB unit terminal
Screw pan (S/P washer) M3.5x6
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents