3 ● Run a Job

Run a Trial Piece

Run a trial piece to test the job settings.
1. Load material and tap the Trial Piece button to verify setup is correct.
2. You can still make changes to the job settings at this point if the trial
piece needs fine tuning. (This requires Supervisor level access.)
a. Tap the Setup button.
b. Log in with Supervisor access level.
c. Tap the
d. Tap the
3. Tap the Setup button to accept the change to the setting and return to
run mode. The inserter saves the job with the new settings.
4. Run another trial piece to test the modified settings.

Trial Pieces and Linked Feeding

If you are using linked feeding, load both sheet feeders before running
a trial piece.
Two trial pieces are produced when linked feeding is enabled.
When running the inserter the display shows: 1 > 2 > 1. This confirms
feeding automatically switches between feeders.

Material Changes or Double Detect Issues During Operation

If you load material during a job run with different characteristics (weight,
color shade, etc.), OR if you have problems with the double detect, run
another trial piece.
This causes the inserter to recalibrate the double detect function for the
new material.
3-12
icons to scroll to the setting you wish to modify.
icons to scroll to the desired option.
SV63138 Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relay 4000

Table of Contents