MAINTENANCE ON CHASSIS AND ENGINE
Changing main fuse
9.58
–
Connect the battery charger to the battery. Switch on the battery charger.
Battery charger (58429074000)
You can also use the battery charger to test rest potential and start potential of the bat-
tery, and to test the generator. With this device, you cannot overcharge the battery.
Info
Never remove the lid
Charge the battery according to the instructions
–
Switch off the charger after charging. Disconnect the battery.
Guideline
The charge current, charge voltage and charge time must not be exceeded.
Charge the battery regularly when the
vehicle is not in use.
–
Install the rear fender. (
100087-10
–
Switch off all power-consuming components and switch off the engine.
.
3 months
p. 142)
129
on the battery casing.