1.1.5
Inspecting and Unpacking Each Cabinet
The first task in preparing for installation is inspecting and unpacking the UPS
cabinets. The UPS and accessory cabinets are shipped bolted to wooden pallets,
as shown in Figures 1---1 and Figure , and protected with outer protective
packaging material.
Figure 1 ---1. Powerware 9330 (IBM 9910 20 kVA) UPS Cabinet as
Powerware 9330 (IBM 9910 20 kVA) Installation and Operation
164201491 REV. B 013004
Shipped on Pallet
1--3