Inspecting and Unpacking the Parallel Cabinet

The first task in preparing for installation of the parallel cabinet is inspecting and
unpacking the cabinet. The cabinet arrives covered with protective packaging
material as shown in Figure 3.
FOAM CUSHION

Figure 3. Cabinet as Shipped, with Outer Packaging and Pallet

1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION:
Do not install a damaged cabinet. Report any damage to the carrier and
contact the local sales or service office immediately.
2.
Use a forklift or other material handling equipment to move the cabinet to a
convenient unpacking area. Insert the forklift jacks between the foam cushions
on the bottom of the unit.
CAUTION:
Do not tilt cabinet more than 10 degrees from vertical.
10
OUTER
PACKAGING
Powerware 9315 Parallel Redundant System I & O
164202013, Rev. D 041599