Inspecting And Unpacking Each Cabinet; Figure 2. Cabinet As Shipped, With Outer Packaging And Pallet - Powerware 9315 Installation Manual

100 kva -- 160 kva
Hide thumbs Also See for 9315:
Table of Contents

Advertisement

Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking each cabinet.
Cabinets arrive covered with protective packaging material as shown in Figure 2.
FOAM CUSHION
1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION:
Do not install a damaged cabinet. Report any damage to the carrier and
contact your local sales or service office immediately.
2.
Use a forklift or other material handling equipment to move the cabinet to a
convenient unpacking area. Insert the forklift jacks between the foam cushions
on the bottom of the unit.
CAUTION:
Do not tilt cabinets more than 10 degrees from vertical.
Powerware 9315 (100 kVA- -160 kVA) Installation
164200292 Rev. E 041500
OUTER
PACKAGING

Figure 2. Cabinet as Shipped, with Outer Packaging and Pallet

7

Advertisement

Table of Contents
loading

Table of Contents