Yamaha Vmax VMX17C 2009 Service Manual page 113

Table of Contents

Advertisement

1. Meter assembly 1 lead
2. Upper radiator inlet pipe
3. Meter assembly couplers
4. Intake funnel servo motor coupler
5. Throttle servo motor lead
6. Canister purge hose (for California only)
7. Frame ground
8. Ignition coil sub-wire harness 1
9. Stator coil lead
10. Fuel pump lead
11. Fuel hose
12. Sidestand switch coupler
13. Gear position switch coupler
14. Fuse box 2
15. Air induction system hose (air cut-off valve to rear
reed valve cover)
16. Starter motor lead
17. Intake air pressure sensor
18. Main switch lead
19. Atmospheric pressure sensor
20. Wire harness
21. Throttle bodies
22. Sub-wire harness
23. Radiator fan motor sub-wire harness coupler
24. Air cut-off valve bracket
A. Insert the projection on the plastic locking tie into
the hole in the wire harness mounting panel, and
then fasten the meter assembly 1 lead with the tie.
B. Fasten the upper radiator inlet pipe with the holder.
Face the catch of the holder to the left.
C. Fit the meter assembly coupler rubber holder onto
the tab on the wire harness mounting panel.
D. Route the intake funnel servo motor lead between
the thermostat assembly and the front frame.
E. Install the plastic locking tie holder onto the throttle
bodies in the area shown in the illustration.
F. Route the intake funnel servo motor lead under the
throttle servo motor lead.
G. Point the ends of the hose clamp for the canister
purge hose to the left. (for California only)
H. Route ignition coil sub-wire harness 1 under the
fuel hose and canister purge hose (for California
only).
I.
Position the wire harness L-shaped guide between
the hydraulic unit assembly box and the rear frame.
J. Route the stator coil lead above the fuel hose and
fuel pump lead.
K. Fasten the stator coil lead and fuel hose with a
plastic locking tie. Position the end of the plastic
locking tie along the fuel tank. Do not cut off the
excess end of the plastic locking tie.
L. Insert the projections on the sidestand switch
coupler and gear position switch coupler into the
holes in the rider seat bracket from below.
M. Fit fuse box 2 into the holder on the hydraulic unit
assembly box.
N. Route the starter relay lead under the air induction
system hose (air cut-off valve to rear reed valve
cover).
O. Insert the projection on the wire harness holder
into the hole in the battery box bracket.
P. Route the starter motor lead to the inside of the
main switch lead.
Q. Fasten the wire harness and starter relay lead with
a plastic locking tie at the location shown in the
illustration.
R. Route the wire harness under the intake air
pressure sensor, fuel hose, and canister purge
hose (for California only).
S. Point the end of the plastic locking tie outward, and
then cut off the excess end of the tie to 1
(0.04
0.20 in).
T. Position the end of the plastic locking tie within the
range shown in the illustration, and then cut off the
excess end of the tie to 0
U. Make sure that the rubber damper contacts the
wire harness guide.
V. Insert the projection on the radiator fan motor sub-
wire harness coupler into the hole in the air cut-off
valve bracket.
W. Fasten the main switch leads, air induction system
solenoid lead, and radiator fan motor sub-wire
harness with the holder. Align the holder with the
white tape on the radiator fan motor sub-wire
harness.
2-60
CABLE ROUTING
5 mm
3 mm (0.00
0.12 in).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vmax vmx17y 20092009 vmx17yc

Table of Contents