G5 Cell Interface; Installation Overview - Nuvation Energy NUVG5 Product Manual

G5 high-voltage bms
Table of Contents

Advertisement

4.2. G5 Cell Interface

4.2.1. Installation Overview

During all stages of the installation, appropriate Personal Protective Equipment (PPE)
must be worn. This is especially critical when working with live voltages.
To complete the installation of the G5 Cell Interface, the following is required:
Cables
To connect your G5 Cell Interface you will require the following cables for each module:
1x Voltage and Thermistor cable
1x Ethernet cable
These cables are available for purchase as a kit.
The instructions below are for applications using cable harnesses purchased from Nuvation Energy. To
build custom cables, refer to
Tools and Materials
You will need the following tools and materials to complete your G5 Cell Interface installation:
Fasteners and tools for attaching the G5 Cell Interface to the end desired surface.
G5 Cell Tap Checker - To test cable connectivity. Contact
purchase
Document ID: NE-DS-011
Nuvation Energy G5 High-Voltage BMS - NUVG5 Product Manual
G5 Cell Interface Connectors
13
for connector pin-out and specifications.
support@nuvationenergy.com
to
Rev 1.0, 2023-05-19
G5 Faraday

Advertisement

Table of Contents
loading

Table of Contents