Sub-Zero 424 Installation Manual page 23

Hide thumbs Also See for 424:
Table of Contents

Advertisement

Models 427 and 427R Installation
Leveling
Level the unit by turning the front leveling legs clockwise
to raise the unit, or counterclockwise to lower it. To assist
you in adjusting the front leveling legs up or down, use a
standard screwdriver blade and place it in the front
leveling leg as shown in the illustration below.
The rear leveling legs are adjusted from the front of the
base by turning the Phillips head screw. Refer to the
illustration below.
IMPORTANT NOTE: The rear leveling legs will only move
1
/
" (2) for every 18 revolutions on the Phillips head
16
screw. Do not over torque. Use the lowest torque setting
on any power screwdriver. Do not turn the rear leveling
legs by hand. Damage will occur if you turn these legs.
To reduce the possibility of the unit tipping forward, the
front leveling legs must be in contact with the floor.
Front leveling legs.
Rear leveling legs.
Install Molding
The decorative white molding strips for the top and sides
of models 427 and 427R can be snapped into place as
shown in the illustrations below. The top molding piece
must be installed before the side molding can be
attached. For installations where units are positioned side
by side, refer to side panels on page 29.
TOP
MOLDING
Top molding.
subzero.com
SIDE
MOLDING
Side molding.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

427427rWs-30424fs

Table of Contents