Removal Of Pcb - Daikin FTKS20DVMW(L) Service Manual

Hide thumbs Also See for FTKS20DVMW(L):
Table of Contents

Advertisement

SiENBE04-507A
1.6

Removal of PCB

Procedure
Step
1. Removing the shelter
1
The figure shows the
appearance of the
electrical box.
2
Open the shelter (at the
back).
3
Push the upper centre
of the shelter and
unfasten the hooks at
the upper 2 positions of
the shelter.
2. Removing the heat
exchanger thermistor
1
Remove the heat
exchanger thermistor
and disconnect the
earth wire.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Signal receiver
PCB
Shelter (back)
Hook
Earth wire
Clamp
Preparation
Remove the electrical box
according to the "Removal
of Electrical Box."
Signal receiver unit
Hooks
Hook
Heat exchanger
thermistor
Indoor Unit
Points
165

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents