Removing Metal Floor Of Factory; Built Fireplace - Quadra-Fire MTVERNINSAE-MBK Owner's Manual

Installation and operation mt vernon pellet insert advanced energy (ae)
Hide thumbs Also See for MTVERNINSAE-MBK:
Table of Contents

Advertisement

Mt. Vernon Pellet Insert (AE)
G. Removing Metal Floor of Factory-Built Firebox
The fi rebrick (refractory), glass doors, screen rails, screen
mesh and log grates can be removed from a factory-built
fi rebox in order to gain minimum insert opening require-
ments.
Any smoke shelves, shields and baffl es may be removed
from a factory-built fi rebox if attached with mechanical fas-
teners.
The metal fl oor of the factory-built fi rebox may be removed
to facilitate the installation of the insert only when a 1/4
inch (6mm) airspace is provided between the insert and
the fl oor of outer wrap.
The following is only one example as there are many differ-
ent models of factory-built fi replaces.
Figure 10.1. Measure and mark the metal
fl oor for cutting. With a drill, make a starter
hole in each corner.
Figure 10.2. Using a saws-all, cut out the
fl oor.
Page 10
Figure 10.3. If the fl oor is made of thin metal,
we recommend using the 2 x 4 from the insert
packaging to support the insert. The 2 x 4
may need to be cut to the appropriate size.
Figure 10.4. Place the insert into the fac-
tory-built fi rebox.
cord can not be damaged by the sharp metal
edge. You may need to cut out a notch to
accomodate the cord.
Figure 10.5. Ensure that the leveling leg is
positioned over the 2 x 4 before leveling the
insert.
7036-135G
Ensure that the power
November 22, 2011
R

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtverninsae-pmhMtverninsae-cwlMtverninsae-csb

Table of Contents