Download Print this page

Installation Of Your Oven - Bush AG56TW Operating And Installation Instruction

Gas twin cavity

Advertisement

Installation of your oven

This modern oven was manufactured with parts and
materials of the highest quality and was designed to
meet your cooking needs. You should read this
manual so that you are able to use the cooker
correctly and to avoid any potential problems with
using the cooker. The following information are the
required rules for correct installation and service of
your cooker. This is particularly important for the
technician who will install the appliance.
CONTACT AN AUTHORISED SERVICE AGENT FOR
INSTALLATION OF YOUR OVEN!
Environment where your appliance will be installed
Your oven must be set up and used in a
it will always have ventilation
While operating, this appliance needs
kw input.
There must be enough natural
the gas to be used in the environment. The average
air flow must directly come in through ventilation from
the outside.
These air holes must have at least the effective cross
2
section of 100cm for fresh air circulation (One or
more air holes can be opened.). Preferably they must
be placed close to the bottom and at opposite side of
where the cooker gas is exhausted. If it is not
possible to open these ventilations in the place where
the appliance is set up, the required air can also be
obtained through the next room, provided that this
place is not a bed room or a dangerous place. In this
case this "next room" must also be ventilated as
required.
6
place where
.
3
2m /h air per
ventilation
to provide
Emptying of the Burned Gases from Environment
For cooking appliances that operate with gas, burned
gas wastes are exhausted directly to the outside or
through cooker hoods that are connected to the a
chimney that opens directly to the outisde. If it is not
possible to install a cooker hood, it is required to set
an electric fan on the window or wall that has access
to fresh air. This electric fan must have the capacity to
change the air of the kitchen environment 4-5 times
of its own volume of air per hour.
Air inlet section
2
min. 100 cm
Figure 1
Air inlet section
2
min. 100 cm
Figure 2

Advertisement

loading

This manual is also suitable for:

Ag56tb