Installing The Switch; Desktop Installation - Planet WGSD-10020 Series User Manual

L2+ gigabit ethernet managed switch
Hide thumbs Also See for WGSD-10020 Series:
Table of Contents

Advertisement

2.2 Installing the Switch

This section describes how to install your Managed Switch and make connections to the Managed Switch. Please read the
following topics and perform the procedures in the order being presented. To install your Managed Switch on a desktop or shelf,
simply complete the following steps.

2.2.1 Desktop Installation

To install the Managed Switch on desktop or shelf, please follows these steps:
Attach the rubber feet to the recessed areas on the bottom of the Managed Switch.
Step 1:
Place the Managed Switch on the desktop or the shelf near an AC power source, as shown in
Step 2:
Keep enough ventilation space between the Managed Switch and the surrounding objects.
Step 3:
When choosing a location, please keep in mind the environmental restrictions discussed in Chapter 1,
Section 4, and Specifications.
Connect the Managed Switch to network devices.
Step 4:
Connect one end of a standard network cable to the 10/100/1000 RJ45 ports on the front of the Managed Switch and the
other end of the cable to the network devices such as printer servers, workstations or routers.
Connection to the Managed Switch requires UTP Category 5 network cabling with RJ45 tips. For more
information, please see the Cabling Specification in Appendix A.
Supply power to the Managed Switch.
Step 5:
Connect one end of the power cable to the Managed Switch.
Connect the power plug of the power cable to a standard wall outlet.
When the Managed Switch receives power, the Power LED should remain solid Green.
Figure 2-21 Place the Managed Switch on the desktop
User's Manual of WGSD / WGSW Layer 2+ Series
37
Figure
2-21.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wgsw-20160hpWgsw-24040 series

Table of Contents