General Information; About This Manual; General Warnings / Notes On Safety - Delta RPI-M8 User Manual

Grid-tied solar inverter
Hide thumbs Also See for RPI-M8:
Table of Contents

Advertisement

1. General Information

1.1 About this Manual

Congratulations on the purchase of your Delta RPI-M8/ M10/ M12/ M15/ M15A/
M20/ M20A/ M30 grid-tied solar inverter. This manual will assist you in becoming
familiar with this product. Please observe all safety regulations and take into
account technical connection conditions required at your local grid utility.

1.2 General Warnings / Notes on Safety

Careful handling of the product will contribute to service life durability and
reliability. Both are essential to ensure maximum yield from your product. As
some of the solar inverter models are heavy, two people may be required for
lifting purposes.
CAUTION!
During operation of electrical devices, certain parts are under
dangerous voltage.
Inappropriate handling can lead to physical injury and material
damage.
Always adhere to the installation regulations. Installation may
only be conducted by certified electricians.
WARNING!
Repair work on the device should ONLY be carried out by the
manufacturer. No user serviceable parts inside.
Please observe all points in the operation and installation manual.
Isolate the device from the grid and the PV modules before
undertaking work on the device.
DANGER!
To avoid risk of electrical shock, do not open the solar inverter.
The inverter contains no internal user-serviceable parts. Opening
the inverter will void the warranty.
Dangerous voltage is present for 5 minutes after disconnecting all
sources of power.
Remember that the unit has a high leakage current. The PE
conductor MUST be connected prior to commencing operation.
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents